Interior Design Blog | Clee Designs
By Sophia Laurent · Published · 4 minutes read

This is the index of every article we've published on interior design — the same guidance we give clients, written for the people doing the planning. Posts are grouped by category so you can jump to what's relevant: budgets and fees, project timelines, materials and sustainability, styling, and room-by-room redesigns.
The most recent posts sit at the top of each category. If you're starting a project, read the budget and timeline pieces first — they set the constraints everything else has to fit inside. If you're already mid-project, the styling and materials articles are the most practical day-to-day references.
Latest Posts
New articles are added as questions come up repeatedly in client work. Recent additions cover how to budget a home office redesign, how to mix patterns and textures without the room feeling chaotic, and a straight comparison of hourly versus flat-rate design fees. Each post is written to be used, not skimmed: expect numbers, ranges, and checklists rather than mood boards.
If you're planning a kitchen, the cost guide breaks down cabinetry, worktops, labour, and contingency into realistic bands for 2025. It pairs well with the timeline article, because kitchens are where budgets and schedules most often slip. Start with How Much Does a Kitchen Redesign Cost in 2025? if that's your next project.
For smaller rooms, the home office budgeting piece is the most useful starting point. It covers furniture tiers, lighting, storage, and the cabling and electrical work people forget to price. Read How to Budget for a Home Office Redesign before you buy anything.
- Budget and fees: what things cost and how designers charge
- Timelines: how long each phase of a project actually takes
- Materials: choosing finishes that last and age well
- Styling: pattern, texture, and layering without clutter
- Room guides: kitchens, home offices, and full-home redesigns
Budgeting and Fees
Budget articles on this site use ranges rather than single figures, because quotes vary by region, property age, and specification level. As a rule of thumb, hold a contingency of 10–15% on renovations and 5–10% on furniture-only projects. If your contingency is smaller than that, the project isn't fully budgeted yet.
Design fees are the other half of the equation. Hourly billing suits small, well-defined scopes; flat-rate or percentage fees suit full-room and full-home projects where the scope is still evolving. The comparison article sets out when each model works in your favour and what to ask before signing.
Read Interior Design Fees: Hourly vs. Flat Rate Comparison alongside your contractor quotes, not after. The two budgets interact: a designer who specifies accurately can save more in avoided changes than their fee costs.
- Contingency: 10–15% for renovations, 5–10% for furniture
- Get three contractor quotes on identical specifications
- Ask whether design fees include site visits and procurement
Timelines and Planning
Most full-room projects run 8–16 weeks from brief to install; full-home projects typically run 4–9 months. The long poles are almost never design decisions — they're lead times on cabinetry, bespoke joinery, and imported furniture, plus any structural work that needs building approval.
The timeline article maps each phase: briefing, concept, technical drawings, procurement, and installation. It also flags where clients commonly lose weeks, such as waiting to approve samples or changing scope after orders are placed. Knowing the sequence makes it easier to make decisions on schedule.
Read How Long Does a Full Interior Design Project Take? before you set a move-in date. Working backwards from a fixed date is the most reliable way to spot a schedule that won't hold.
- Full room: 8–16 weeks end to end
- Full home: 4–9 months, longer with structural work
- Order long-lead items first: cabinetry, sofas, tiles
- Approve samples within one week to keep momentum
Materials and Sustainability
Material choices drive both cost and longevity. Natural stone and hardwood cost more upfront but often outlast engineered alternatives; mid-range engineered wood and porcelain are sensible compromises in high-traffic areas. The materials article explains how to weigh embodied carbon, durability, and maintenance together rather than treating sustainability as a separate box.
Practical starting points: specify FSC-certified timber, low-VOC paints and adhesives, and natural fibres where wear allows. Reclaimed and recycled-content materials are increasingly viable for flooring and joinery, though availability varies, so confirm lead times early.
Read How to Choose Sustainable Materials for Your Renovation for a room-by-room breakdown and the questions to put to suppliers.
- Prioritise durability — the greenest material is the one you don't replace
- Ask for FSC certification on all timber
- Specify low-VOC paints, sealants, and adhesives
- Check recycled-content options for flooring and tiles
Styling: Pattern, Texture, and Colour
Styling articles focus on rules that hold up in real rooms. With pattern, the working principle is scale contrast: pair a large motif with a small one, and keep a common colour thread between them. Three patterns in one room is usually plenty; four needs a very restrained palette to work.
Texture does more for a room than pattern in most cases, especially in neutral schemes. Mixing matte and sheen finishes, chunky knits with smooth linen, and rough ceramics with glass gives depth without adding visual noise. The patterns article covers proportions and where to stop.
Read How to Mix Patterns and Textures Like a Designer for a step-by-step approach to layering a room.
- One large pattern, one small, one textural solid
- Repeat a single accent colour across all patterns
- Mix at least three textures in neutral rooms
- Photograph the scheme before committing to fabric orders
| Project scope | Typical duration | Design fee model | Contingency |
|---|---|---|---|
| Single room refresh (furniture and paint) | 4–8 weeks | Hourly or fixed fee | 5–10% |
| Home office redesign | 6–10 weeks | Hourly or fixed fee | 5–10% |
| Kitchen redesign | 10–16 weeks | Fixed fee or percentage | 10–15% |
| Full room renovation (incl. services) | 12–20 weeks | Percentage of works | 10–15% |
| Full-home redesign | 4–9 months | Percentage of works | 10–15% |
| Full-home renovation with structural work | 6–12 months | Percentage of works | 15–20% |
Room Guides
Room guides translate the general principles into specific plans. The kitchen guide covers layout costs, appliance tiers, and where to spend versus save. The home office guide covers desk ergonomics, lighting layers, and storage that hides cable clutter.
Each guide includes a specification table and a short list of decisions to make before work starts. They're written to be printed and marked up — the checklists are the useful part.
Start with How Much Does a Kitchen Redesign Cost in 2025? or How to Budget for a Home Office Redesign depending on your next project.
- Kitchens: cabinetry, worktops, appliances, labour
- Home offices: desk, lighting, storage, electrical
- Full-home redesigns: phasing and sequencing
- Start with the budget and timeline articles — they set the constraints for everything else.
- Hold 10–15% contingency on renovations; 5–10% on furniture-only projects.
- Long lead times on cabinetry and bespoke items drive most schedule slippage.
- Use the room guides as printable checklists before work begins.
Sophia brings a background in sustainable design and color theory to her writing. She is passionate about helping people create beautiful, eco-friendly spaces on any budget. Her articles often explore material choices and innovative solutions for small spaces.